The Dry Port of Chaykovsky Infrastructure
The territory adjacent to the Dry Port is free for production locating and partially provided with infrastructure
Territory for development projects
12.7 ha of land for industrial use
Traction substation
12.6 MW traction substation
Container terminal
10,800 sq.m., 750 TEU storage volume, 3008 m of terminal railway, reachstacker that can handle from two lines
Oris
Investment site for lumber production locating
Chaykovsky CHP
Heat, power and steam supply
Traffic road
Entry to the M7 highway
12.7 ha of land for industrial use
Territory for development projects
12.6 MW traction substation
Investment site for lumber production locating
Oris
Heat, power and steam supply
Chaykovsky CHP
10,800 sq.m., 750 TEU storage volume, 3008 m of terminal railway, reachstacker that can handle from two lines
Container terminal
Traction substation
Entry to the M7 highway
Traffic road
Park for the formation of high-speed trains with a capacity of 4 units
Park A
Park A
Park for the formation of high-speed trains with a capacity of 4 units
Station cloth room
RZD carhouses
10 railway lines with the capacity of acceptance / departure of trains of 71 conventional wagons in length
Kauchuk railway station
Station cloth room
Kauchuk railway station
10 railway lines with the capacity of acceptance / departure of trains of 71 conventional wagons in length
RZD carhouses and control room
The park is based on powerful locomotives of the TEM-2 and TEM-18 series
9 locomotives
Control room
The total length of railway lines
53.5 km of railway lines
9 locomotives
The park is based on powerful locomotives of the TEM-2 and TEM-18 series
53.5 km of railway lines
The total length of railway lines
Contact us
Drachev Andrey
CEO of LLC Kvadrat

+73424174788
+79194449190
a.drachev@dryport.su
Kryuchkova Irina
Senior accountant

+73424174788
i.kruchkova@dryport.su
Shemyakin Artyom
Terminal

+73424174788
+79223591813
a.shemyakin@dryport.su